| Date | By | Action | Description |
|---|---|---|---|
| 2026-09-01 08:42 | Faisal Al-Otaibi | created | DOS initiated from well programme WO-4471-26 |
| 2026-09-04 14:05 | Faisal Al-Otaibi | revised | Rev 1: water cut updated from 8% to 12% following offset well data |
| 2026-09-09 10:18 | Faisal Al-Otaibi | revised | Rev 2: H2S revised to 1850 ppm per latest PVT report |
| 2026-09-09 16:30 | Faisal Al-Otaibi | submitted review | Submitted to Testing Engineering Lead for review |
This Design of Service defines the surface well testing programme for well JBL-0142 in the Jubaylah field, producing from the Arab-D reservoir. The objective is a 72 hour post-stimulation flowback at a target liquid rate of 4,500 bbl/d, with the wellhead held at 1,450 psia flowing pressure. All equipment sizing, operating limits and safety distances in this document are derived from the well and fluid data in section 3 using the calculation basis in section 5 and the assumptions register extract in section 8.
| Client | Saudi Aramco | Client reference | WO-4471-26 |
| Service line | Surface Well Testing | Operation type | Post-Stimulation Flowback |
| Location | Onshore | Planned start | 2026-10-06 |
| Planned duration | 72 hours | Service classification | Sour (see section 7) |
| True vertical depth | 8,450 ft |
| Measured depth | 9,120 ft |
| Maximum inclination | 28.5 ° |
| Casing OD | 9.625 in |
| Tubing OD / ID | 4.500 / 3.958 in |
| Perforated interval | 8,180 – 8,310 ft |
| Packer depth | 8,050 ft |
| Reservoir pressure | 4,250 psia |
| Reservoir temperature | 248 °F |
| Productivity index | 1.85 stb/d/psi |
| Bubble point pressure | 2,150 psia |
| Oil gravity | 34.2 °API |
| Gas specific gravity | 0.740 |
| Water specific gravity | 1.040 |
| Gas-oil ratio | 620 scf/stb |
| Water cut | 12.0 % |
| Hydrogen sulphide | 1,850 ppm |
| Carbon dioxide | 4.20 mol % |
| Nitrogen | 1.10 mol % |
| Produced solids | 0.60 lb/1000 bbl |
| Target liquid rate | 4,500 bbl/d |
| Wellhead flowing pressure | 1,450 psia |
| Wellhead flowing temperature | 168 °F |
| Separator pressure | 350 psia |
| Separator inlet target temperature | 180 °F |
| Flowline length | 220 ft |
| Burner to manned area | 165 ft |
| Ambient temperature | 95 °F |
| Design wind speed | 12 mph |
| Position | Asset | Description | MAWP | Temp rating | Material class | Sour |
|---|---|---|---|---|---|---|
| Flowhead | FH-5015 | Surface Test Tree 5-1/8 in 10K | 10,000 psi | 250 °F | API 6A EE-NL-PSL3-PR1 | Yes |
| Choke Manifold | CM-1002 | Dual Choke Manifold 3-1/16 in 10K | 10,000 psi | 250 °F | API 6A EE-NL-PSL3 | Yes |
| Flowline | FL-0400 | 4 in Sch 160 flowline, 10K rated | 10,000 psi | 250 °F | ASTM A106 Gr.B / NACE | Yes |
| Heater | HT-0500 | Indirect Glycol Bath Heater 5.0 MMBtu/hr | 10,000 psi | 250 °F | ASME Sec VIII Div 1 | Yes |
| Separator | SP-1440 | 3-Phase Horizontal Separator 1440 psi, 42 in x 12 ft | 1,440 psi | 250 °F | ASME Sec VIII Div 1 / NACE | Yes |
| Surge Tank | ST-0100 | Atmospheric Surge Tank 100 bbl | 50 psi | 150 °F | API 12F | Yes |
| Burner | BN-4801 | Green Dragon Oil Burner, twin head | — | — | — | No |
| Esd | ES-0001 | Wellhead ESD Panel, 3-station | — | — | — | Yes |
Each value below is produced by the platform's calculation engine from the data in section 3. The governing expression and the substituted values are printed with every result so that the calculation can be checked line by line without access to the software.
| Quantity | Value | Basis and calculation |
|---|---|---|
| Oil specific gravity (γ_o) | 0.8540 - |
γ_o = 141.5 / (131.5 + °API)
141.5 / (131.5 + 34.2) = 0.8540
API standard gravity definition |
| Oil rate at target (q_o) | 3,960 stb/d |
q_o = q_liq × (1 − WC)
4,500 × (1 − 0.120) = 3,960
Test objective |
| Water rate at target (q_w) | 540 bbl/d |
q_w = q_liq × WC
4,500 × 0.120 = 540
Test objective |
| Associated gas rate (q_g) | 2.455 MMscf/d |
q_g = q_o × GOR
3,960 × 620 = 2,455,200 scf/d
Test objective |
| Gas-liquid ratio (R) | 546 scf/bbl |
GLR = q_g / q_liq
2,455,200 / 4,500 = 546
Drives the choke correlation |
| Blended liquid specific gravity (γ_l) | 0.8763 - |
γ_l = (1 − WC)·γ_o + WC·γ_w
(1 − 0.120)·0.8540 + 0.120·1.0400 = 0.8763
Volume-weighted blend |
| Pseudo-critical temperature (sweet basis) (T_pc) | 387.3 °R |
T_pc = 169.2 + 349.5·γ_g − 74.0·γ_g²
169.2 + 349.5(0.7400) − 74.0(0.7400)² = 387.3
Sutton (1985) |
| Pseudo-critical pressure (sweet basis) (P_pc) | 657.9 psia |
P_pc = 756.8 − 131.0·γ_g − 3.6·γ_g²
756.8 − 131.0(0.7400) − 3.6(0.7400)² = 657.9
Sutton (1985) |
| Wichert-Aziz acid gas correction (ε) | 7.03 °R |
ε = 120(A^0.9 − A^1.6) + 15(B^0.5 − B⁴), A = y_H2S + y_CO2, B = y_H2S
A = 0.04385, B = 0.001850 → ε = 7.03 °R
Wichert & Aziz (1972) Without this correction the Z-factor for this sour stream would be wrong, and every downstream volume with it. |
| Gas compressibility at wellhead (Z) | 0.8664 - |
Z = A + (1−A)/e^B + C·P_pr^D (Brill & Beggs fit to Standing-Katz)
P_pr = 2.245, T_pr = 1.651 → Z = 0.8664
Brill & Beggs (1974) |
| Gas density at wellhead (ρ_g) | 5.326 lb/ft³ |
ρ_g = 2.70·γ_g·P / (Z·T)
2.70(0.7400)(1,450) / (0.8664 × 627.7) = 5.326
Real gas law |
| Oil formation volume factor (B_o) | 1.3344 rb/stb |
B_o = 0.9759 + 0.00012·[R_s·√(γ_g/γ_o) + 1.25·T]^1.2
R_s = 620, T = 168 °F → B_o = 1.3344
Standing (1947) |
| Total mass flow rate (ṁ) | 63,344 lb/hr |
ṁ = ṁ_gas + ṁ_oil + ṁ_water
5,781 + 49,365 + 8,198 = 63,344 lb/hr
Mass balance |
| Gas mass fraction (x_g) | 9.1 % |
x_g = ṁ_gas / ṁ_total
5,781 / 63,344 = 9.1 %
Used to weight the Joule-Thomson coefficient |
| Quantity | Value | Basis and calculation |
|---|---|---|
| Rate at bubble point (q_b) | 3,885 stb/d |
q_b = J × (P_r − P_b)
1.850 × (4,250 − 2,150) = 3,885
Straight-line IPR above bubble point |
| Absolute open flow potential (q_max) | 6,095 stb/d |
q_max = q_b + J·P_b / 1.8
3,885 + 1.850(2,150)/1.8 = 6,095
Vogel (1968) composite IPR |
| Flowing bottomhole pressure required (P_wf) | 2,109 psia |
q/q_max = 1 − 0.2(P_wf/P_r) − 0.8(P_wf/P_r)² solved for P_wf
q = 3,960 stb/d → P_wf = 2,109 psia
Vogel (1968) |
| Drawdown at target rate (ΔP) | 2,141 psi |
ΔP = P_r − P_wf
4,250 − 2,109 = 2,141
Reservoir management constraint |
| Fraction of open flow potential | 65.0 % |
q / q_max
3,960 / 6,095 = 65.0 %
Rate feasibility screen |
| Quantity | Value | Basis and calculation |
|---|---|---|
| Maximum anticipated surface pressure (MASP) | 3,435 psia |
MASP = P_r · exp(−0.01875·γ_g·TVD / (Z̄·T̄))
4,250 · exp(−0.01875(0.7400)(8,450)/(0.8728 × 631.2)) = 3,435
Compressible static gas column, gas-filled tubing worst case |
| Minimum equipment rating required | 3,779 psia |
MAWP_min = MASP × (1 + design margin)
3,435 × (1 + 10%) = 3,779
NESR ES-WT-002 design margin |
| Rated pressure of weakest upstream item | 10,000 psi |
min(MAWP) across flowhead, choke manifold and flowline
Surface Test Tree 5-1/8 in 10K (FH-5015) = 10,000 psi
API 6A / ISO 10423 pressure class |
| Site pressure test value | 3,779 psi |
P_test = MASP × test factor
3,435 × 1.10 = 3,779
ASME B31.3 / client test procedure Hold 15 minutes with an acceptance criterion of no visible pressure decay. |
| Quantity | Value | Basis and calculation |
|---|---|---|
| Required choke bean size (d) | 38 64ths in |
d = (A · q_liq · R^B / P_wh)^(1/C)
(10.000 × 4,500 × 546^0.546 / 1,450)^(1/1.890) = 38.02 → 38/64 in
Gilbert (1954) multiphase critical flow correlation Rounded up to the nearest available bean in the manifold. |
| Equivalent bean diameter | 0.5938 in |
d_in = d / 64
38 / 64 = 0.5938 in
|
| Bean flow area (A) | 0.27688 in² |
A = π·d²/4
π(0.5938)²/4 = 0.27688 in²
|
| Pressure drop across the bean (ΔP) | 1,100 psi |
ΔP = P_wh − P_downstream
1,450 − 350 = 1,100
Drives Joule-Thomson cooling and erosion |
| Downstream / upstream pressure ratio | 0.241 - |
P_dn / P_up vs critical ratio
350 / 1,450 = 0.241 (critical at ≤ 0.55)
Isentropic choked flow Flow is critical. Rate is set by the bean and upstream pressure only, and is independent of separator pressure. This is the condition required for a stable, repeatable test. |
| Correlation | A | B | C | Bean (64ths) | Bean (in) |
|---|---|---|---|---|---|
| Gilbert (1954) | 10.000 | 0.546 | 1.890 | 38.0 | 0.5940 |
| Ros (1960) | 17.400 | 0.500 | 2.000 | 35.5 | 0.5549 |
| Baxendell (1957) | 9.560 | 0.546 | 1.930 | 34.4 | 0.5382 |
| Achong (1961) | 3.820 | 0.650 | 1.880 | 32.9 | 0.5144 |
| Quantity | Value | Basis and calculation |
|---|---|---|
| Mixture density at flowline conditions (ρ_m) | 10.276 lb/ft³ |
ρ_m = (12409·γ_l·P + 2.7·R·γ_g·P) / (198.7·P + R·T·Z)
P = 350 psia, T = 639.7 °R, R = 546 scf/bbl, Z = 0.9683 → 10.276 lb/ft³
API RP 14E section 2.5 |
| Applied erosional C-factor (C) | 125.0 - |
C = C_intermittent × (sand derate if applicable)
125, no derate (sand 0.60 pptb < 1.0 pptb trigger)
API RP 14E + NESR ES-WT-011 |
| Erosional velocity limit (V_e) | 38.99 ft/s |
V_e = C / √ρ_m
125.0 / √10.276 = 38.99 ft/s
API RP 14E |
| Actual volumetric flow at flowline conditions (q) | 1.8005 ft³/s |
q = q_gas·B_g/86400 + (q_o·B_o + q_w)·5.615/86400
gas 1.4221 + liquid 0.3785 = 1.8005 ft³/s
|
| Actual mixture velocity (V) | 27.93 ft/s |
V = q / A, A = π·d²/4
1.8005 / 0.06447 = 27.93 ft/s (3.438 in ID)
|
| Erosional velocity ratio (EVR) | 0.716 - |
EVR = V / V_e
27.93 / 38.99 = 0.716
Design target ≤ 0.80 |
| Minimum flowline ID to satisfy the limit (d_min) | 2.910 in |
d_min = √(4q / (π·V_e))
√(4×1.8005 / (π×38.99)) = 2.910 in
|
| Produced solids mass rate | 0.113 lb/hr |
ṁ_sand = q_liq × sand / 1000 / 24
4,500 × 0.60 / 1000 / 24 = 0.113 lb/hr
Sand management trigger |
| Quantity | Value | Basis and calculation |
|---|---|---|
| Effective Joule-Thomson coefficient (μ_JT) | 0.00865 °F/psi |
μ_JT = x_g·μ_gas + (1 − x_g)·μ_liquid
0.0913(0.0450) + 0.9087(0.0050) = 0.00865 °F/psi
Mass-weighted from the stream composition Weighting matters: a gas well cools an order of magnitude more across the same pressure drop than an oil well. |
| Temperature drop across the bean (ΔT) | 9.5 °F |
ΔT = μ_JT × ΔP
0.00865 × 1,100 = 9.5 °F
Joule-Thomson expansion |
| Temperature downstream of the bean (T_dn) | 158.5 °F |
T_dn = T_wh − ΔT
168 − 9.5 = 158.5 °F
|
| Hydrate formation temperature at separator pressure (T_h) | 52.1 °F |
T_h = −238.245 + 78.997·log P − 5.353·(log P)² + 349.474·γ_g − 150.855·γ_g² − 27.604·γ_g·log P
P = 350 psia, γ_g = 0.7400 → T_h = 52.1 °F
Motiee (1991) |
| Minimum process temperature | 180.0 °F |
T_req = max(T_h + margin, T_separator target)
max(52.1 + 10, 180) = 180.0 °F
Hydrate margin NESR ES-WT-004; separator target set by emulsion and viscosity control |
| Heating required | 21.5 °F |
ΔT_heat = T_req − T_dn
180.0 − 158.5 = 21.5 °F
|
| Process heat duty (Q) | 0.755 MMBtu/hr |
Q = Σ(ṁ_i · c_p,i) · ΔT
(5,781×0.55 + 49,365×0.48 + 8,198×1.00) × 21.5 = 754,607 Btu/hr
Sensible heat balance, GPSA specific heats |
| Fired duty required | 1.132 MMBtu/hr |
Q_fired = Q × design factor / thermal efficiency
0.755 × 1.20 / 0.80 = 1.132 MMBtu/hr
Vendor efficiency, NESR ES-WT-006 design factor |
| Quantity | Value | Basis and calculation |
|---|---|---|
| Gas density at separator (ρ_g) | 1.1289 lb/ft³ |
ρ_g = 2.70·γ_g·P / (Z·T)
P = 350 psia, T = 180 °F, Z = 0.9683 → 1.1289 lb/ft³
|
| Maximum gas velocity before carryover (V_max) | 2.755 ft/s |
V_max = K·√((ρ_l − ρ_g)/ρ_g)
0.40·√((54.68 − 1.1289)/1.1289) = 2.755 ft/s
Souders-Brown, API 12J, K for horizontal vessel with mist extractor |
| Gas disengagement area | 4.811 ft² |
A_gas = (1 − fill)·π·D²/4
(1 − 0.50)·π(3.50)²/4 = 4.811 ft²
Half-full horizontal vessel design case |
| Separator gas capacity | 22.88 MMscf/d |
q_max = V_max · A_gas · 86400 / B_g
2.755 × 4.811 × 86400 / 0.05004 = 22.88 MMscf/d
API 12J |
| Gas capacity utilisation | 10.7 % |
q_gas / q_max
2.455 / 22.88 = 10.7 %
|
| Liquid volume required for retention | 52.64 ft³ |
V = (q_o·t_o + q_w·t_w) × 5.615 / 1440
(3,960×3.0 + 540×3.0) × 5.615 / 1440 = 52.64 ft³
API 12J retention times |
| Liquid volume available | 57.73 ft³ |
V = fill · π·D²/4 · L
0.50 · π(3.50)²/4 · 12.0 = 57.73 ft³
|
| Separator liquid capacity | 4,935 bbl/d |
q_max = V_avail / 5.615 × 1440 / t_retention
57.73 / 5.615 × 1440 / 3.0 = 4,935 bbl/d
API 12J |
| Liquid capacity utilisation | 91.2 % |
V_required / V_available
52.64 / 57.73 = 91.2 %
|
| Quantity | Value | Basis and calculation |
|---|---|---|
| Total heat release at the burner (Q) | 1,010.8 MMBtu/hr |
Q = ṁ_oil·LHV_oil + q_gas·LHV_gas
49,365 lb/hr × 18,300 + 102,300 scf/hr × 1,050 = 1,010,796,227 Btu/hr
GPSA heating values |
| Flame length (L) | 120.9 ft |
L = 0.006 · Q^0.478
0.006 × (1,010,796,227)^0.478 = 120.9 ft
API STD 521 Annex C |
| Fraction of heat radiated (F) | 0.200 - |
Selected by combustion type
Oil burner → F = 0.200
API STD 521 Annex C |
| Safe distance, continuously manned area (D) | 179 ft |
D = √(τ·F·Q / (4π·K))
√(1.00 × 0.200 × 1,010,796,227 / (4π × 500)) = 179 ft
API STD 521 Table 8, 1.58 kW/m² |
| Radiation at the planned stand-off (K) | 591 Btu/hr·ft² |
K = τ·F·Q / (4π·D²)
τ·F·Q / (4π × 165²) = 591 Btu/hr·ft² (1.86 kW/m²)
API STD 521 |
| Exposure category | Limit | Equivalent | Minimum distance |
|---|---|---|---|
| Continuously manned area | 500 Btu/hr·ft² | 1.58 kW/m² | 179 ft |
| Escape route, seconds of exposure | 1,500 Btu/hr·ft² | 4.73 kW/m² | 104 ft |
| Equipment and unmanned areas | 2,000 Btu/hr·ft² | 6.31 kW/m² | 90 ft |
| Quantity | Value | Basis and calculation |
|---|---|---|
| H₂S partial pressure at MASP (p_H2S) | 6.3552 psia |
p_H2S = y_H2S × P
(1,850 / 10⁶) × 3,435 = 6.3552 psia
NACE MR0175 / ISO 15156-1 |
| Service classification | Sour service |
p_H2S ≥ 0.05 psia → sour service
NACE MR0175 / ISO 15156 All wetted pressure-containing components must carry NACE MR0175 certification, and personnel controls for H₂S apply for the full duration of the test. |
| Personal alarm set point | 10 ppm |
Fixed by HSE case
10 ppm
Client HSE case |
| Immediately dangerous to life or health | 100 ppm |
NIOSH IDLH
100 ppm
NIOSH |
Every check below is evaluated automatically against the standard named in the basis column. A critical failure prevents this document from being issued.
| Ref | Check | Result | Actual vs limit | Finding and basis |
|---|---|---|---|---|
| RAD-001 | Thermal radiation at manned areas critical |
FAIL | 591 Btu/hr·ft² 500 Btu/hr·ft² |
At the planned 165 ft stand-off, radiation reaches 591 Btu/hr·ft² against the 500 Btu/hr·ft² limit for continuously manned areas. Minimum acceptable stand-off is 179 ft. Action required: Move the manned area to at least 179 ft, extend the burner boom, deploy the water curtain, or reduce the flowing rate. API STD 521 Table 8 / IOGP 434-18
|
| SEP-002 | Separator liquid retention capacity critical |
CAUTION | 91.2 % ≤ 85 % |
Vessel is loaded above the design comfort threshold. Any rate increase during the test will push it past capacity. Action required: Select the next size separator, reduce the target rate, or raise separator pressure to shrink gas volume. API SPEC 12J
|
| SOU-002 | H₂S exposure controls major |
CAUTION | 1,850 ppm in stream IDLH 100 ppm |
Stream H₂S concentration exceeds the IDLH threshold. Continuous gas detection, cascade breathing air, wind socks, muster points and a documented H₂S contingency plan are mandatory for the full test. Action required: Attach the H₂S contingency plan and the drill record to this DOS before issue. NIOSH / client HSE case
|
| CHK-001 | Critical flow across the bean major |
PASS | ratio 0.241 ≤ 0.55 |
The bean is in critical flow, so measured rates will be stable and independent of downstream conditions. Isentropic choked flow, k ≈ 1.27
|
| CHK-002 | Choke correlation sensitivity advisory |
PASS | 13.4 % spread below 40 % |
The four published correlations disagree by 13.4 % on bean size for this fluid. The correlations are in reasonable agreement for this fluid. Comparison of Gilbert, Ros, Baxendell and Achong
|
| DEL-001 | Target rate against inflow performance major |
PASS | 65.0 % of AOF below 90 % of AOF |
The target rate is comfortably inside the well's deliverability. Vogel (1968) IPR from the supplied productivity index
|
| ERO-001 | Erosional velocity in the flowline critical |
PASS | EVR 0.716 ≤ 0.80 |
Velocity is at 72 % of the erosional limit with adequate margin. API RP 14E
|
| FLU-001 | Z-factor correlation validity advisory |
PASS | T_pr 1.65 / P_pr 2.24 1.15 < T_pr < 2.4, P_pr < 15 |
Wellhead conditions are inside the published validity window of the correlation. Brill & Beggs (1974)
|
| HYD-001 | Hydrate formation margin downstream of the bean critical |
PASS | 106.4 °F margin ≥ 10 °F |
Stream stays 106.4 °F above the hydrate curve without heating. Motiee (1991) hydrate correlation, NESR ES-WT-004 margin
|
| HYD-002 | Heater duty adequacy major |
PASS | 1.132 MMBtu/hr required 5.00 MMBtu/hr rated |
Selected heater covers the fired duty at 23 % utilisation. The selected 5.0 MMBtu/hr unit is significantly oversized at 23 % utilisation; a smaller unit would reduce mobilisation cost. NESR ES-WT-006
|
| PRS-001 | Upstream pressure containment critical |
PASS | MASP 3,435 psia MAWP 10,000 psi |
Weakest upstream component is rated 10,000 psi against a MASP of 3,435 psia, a margin of 65.6 %. API 6A / NESR ES-WT-002
|
| PRS-002 | Separator relief protection critical |
PASS | Operating 350 psia MAWP 1,440 psi |
Separator rating is adequate for the planned operating pressure. A relief valve sized for the choke-washout case is still required. Action required: Confirm PSV set pressure at or below the vessel MAWP and size it for full choke bypass flow. API RP 14C / API 12J
|
| SEP-001 | Separator gas handling capacity critical |
PASS | 10.7 % ≤ 85 % |
Vessel has adequate capacity for the design case. API SPEC 12J
|
| SOU-001 | Sour service material compliance critical |
PASS | 6.3552 psia H₂S ≥ 0.05 psia triggers sour service |
Sour service confirmed at 6.355 psia H₂S partial pressure. All rated components on the spread carry NACE MR0175 certification. NACE MR0175 / ISO 15156
|
| Parameter | Limit | Basis |
|---|---|---|
| Maximum anticipated surface pressure | 3,435 psia | Static gas column from reservoir pressure |
| Site pressure test value | 3,779 psi, 15 minute hold | ASME B31.3 / client test procedure |
| Choke bean, design case | 38/64 in | Governed choke correlation |
| Minimum separator inlet temperature | 52 °F + 10 °F margin | Hydrate control |
| Maximum flowline velocity | 39.0 ft/s | API RP 14E erosional limit |
| Separator operating pressure | 350 psia | Design case, PSV set at vessel MAWP |
| Minimum stand-off, manned areas | 179 ft | API STD 521, 500 Btu/hr·ft² |
| H₂S personal alarm | 10 ppm, evacuate at 15 ppm | Client HSE case |
| ESD closure, surface safety valve | 7 seconds maximum | API RP 14C |
The constants, correlation coefficients and design limits below were read from the company assumptions register at the time this document was generated. Each carries its revision number, so the calculation can be reproduced exactly at any future date.
| Category | Assumption | Value | Rev | Basis |
|---|---|---|---|---|
| Choke model | Achong coefficient A | 3.82 - | 1 | Achong (1961) |
| Choke model | Achong exponent B (GLR) | 0.65 - | 1 | Achong (1961) |
| Choke model | Achong exponent C (bean) | 1.88 - | 1 | Achong (1961) |
| Choke model | Baxendell coefficient A | 9.56 - | 1 | Baxendell (1957) |
| Choke model | Baxendell exponent B (GLR) | 0.546 - | 1 | Baxendell (1957) |
| Choke model | Baxendell exponent C (bean) | 1.93 - | 1 | Baxendell (1957) |
| Choke model | Critical (sonic) pressure ratio | 0.55 Pdn/Pup | 2 | Isentropic choked flow, k~1.27 |
| Choke model | Gilbert coefficient A | 10 - | 1 | Gilbert (1954), API 14B practice |
| Choke model | Gilbert exponent B (GLR) | 0.546 - | 1 | Gilbert (1954) |
| Choke model | Gilbert exponent C (bean) | 1.89 - | 1 | Gilbert (1954) |
| Choke model | Ros coefficient A | 17.4 - | 1 | Ros (1960) |
| Choke model | Ros exponent B (GLR) | 0.5 - | 1 | Ros (1960) |
| Choke model | Ros exponent C (bean) | 2 - | 1 | Ros (1960) |
| Deliverability | Vogel IPR coefficient on (Pwf/Pr) | 0.2 - | 1 | Vogel (1968) |
| Deliverability | Vogel IPR coefficient on (Pwf/Pr)^2 | 0.8 - | 1 | Vogel (1968) |
| Erosion | API 14E C-factor, intermittent service | 125 - | 1 | API RP 14E 2.5 |
| Erosion | C-factor derating when sand is present | 0.6 fraction | 3 | NESR internal ES-WT-011 |
| Erosion | Erosional velocity ratio caution threshold | 0.8 - | 1 | NESR internal ES-WT-011 |
| Erosion | Sand concentration triggering derate | 1 pptb | 2 | NESR internal ES-WT-011 |
| Heating | Heater duty design factor | 1.2 - | 2 | NESR internal ES-WT-006 |
| Heating | Indirect heater thermal efficiency | 0.8 fraction | 1 | Vendor data, glycol bath heaters |
| Heating | Specific heat of crude oil | 0.48 Btu/lb-degF | 1 | GPSA Data Book Sec. 23 |
| Heating | Specific heat of gas | 0.55 Btu/lb-degF | 1 | GPSA Data Book Fig. 24-7 |
| Heating | Specific heat of produced water | 1 Btu/lb-degF | 1 | Standard |
| Hydrates | Joule-Thomson cooling coefficient, gas phase | 0.045 degF/psi | 4 | Field-calibrated, MENA gas 0.6-0.75 SG |
| Hydrates | Minimum margin above hydrate formation temperature | 10 degF | 2 | NESR internal ES-WT-004 |
| Pressure integrity | Minimum margin of equipment MAWP over MASP | 10 % | 3 | NESR internal ES-WT-002 |
| Pressure integrity | Site pressure test factor on MOP | 1.1 - | 1 | ASME B31.3 / client procedure |
| Radiation | Atmospheric transmissivity | 1 - | 1 | API STD 521 6.4.2 |
| Radiation | Flame length correlation coefficient | 0.006 - | 1 | API STD 521 Annex C |
| Radiation | Flame length correlation exponent | 0.478 - | 1 | API STD 521 Annex C |
| Radiation | Fraction of heat radiated, oil burner | 0.2 - | 1 | API STD 521 Annex C |
| Radiation | Lower heating value of associated gas | 1,050 Btu/scf | 2 | GPSA Data Book Sec. 23 |
| Radiation | Lower heating value of crude | 18,300 Btu/lb | 1 | GPSA Data Book Sec. 23 |
| Radiation | Radiation limit, continuously manned area | 500 Btu/hr-ft2 | 1 | API STD 521 Table 8 (1.58 kW/m2) |
| Radiation | Radiation limit, equipment and unmanned areas | 2,000 Btu/hr-ft2 | 1 | API STD 521 Table 8 (6.31 kW/m2) |
| Radiation | Radiation limit, escape route, few seconds exposure | 1,500 Btu/hr-ft2 | 1 | API STD 521 Table 8 (4.73 kW/m2) |
| Separation | Design liquid fill fraction of separator volume | 0.5 fraction | 1 | API 12J |
| Separation | Oil retention time | 3 minutes | 2 | API 12J Table 1, 30-40 API crude |
| Separation | Separator utilisation caution threshold | 0.85 fraction | 1 | NESR internal ES-WT-008 |
| Separation | Souders-Brown K, horizontal vessel with mist extractor | 0.4 ft/s | 1 | API 12J / Arnold & Stewart |
| Separation | Water retention time | 3 minutes | 1 | API 12J Table 1 |
| Sour service | H2S immediately dangerous to life or health | 100 ppm | 1 | NIOSH |
| Sour service | H2S partial pressure threshold for sour service | 0.05 psia | 1 | NACE MR0175 / ISO 15156-1 |
| Sour service | H2S personal alarm set point | 10 ppm | 1 | OSHA / client HSE case |
| Reference | Title | Edition | Applied to |
|---|---|---|---|
| API RP 14C | Analysis, Design, Installation and Testing of Basic Surface Safety Systems | 8th Ed. | ESD architecture and relief protection |
| API RP 14E | Design and Installation of Offshore Production Platform Piping Systems | 5th Ed. | Erosional velocity limits, flowline sizing |
| API SPEC 12J | Specification for Oil and Gas Separators | 8th Ed. | Separator gas and liquid capacity |
| API SPEC 6A | Specification for Wellhead and Christmas Tree Equipment | 21st Ed. | Pressure ratings of flow control equipment |
| API STD 521 | Pressure-relieving and Depressuring Systems | 7th Ed. | Flare / burner thermal radiation and flame length |
| ASME B31.3 | Process Piping | 2022 | Flowline wall thickness and test pressure |
| IOGP 434-18 | Risk assessment data - thermal radiation exposure | 2019 | Personnel exposure thresholds |
| ISO 10423 | Wellhead and christmas tree equipment | 2009 | Equipment pressure/temperature class |
| NACE MR0175 | Materials for use in H2S-containing environments (ISO 15156) | 2015 | Sour service classification |