| Date | By | Action | Description |
|---|---|---|---|
| 2026-09-11 09:15 | Faisal Al-Otaibi | created | DOS initiated for HP/HT exploration DST |
This Design of Service defines the surface well testing programme for well SHB-003 in the Sahba field, producing from the Najmah reservoir. The objective is a 96 hour hp/ht exploration dst at a target liquid rate of 1,200 bbl/d, with the wellhead held at 5,200 psia flowing pressure. All equipment sizing, operating limits and safety distances in this document are derived from the well and fluid data in section 3 using the calculation basis in section 5 and the assumptions register extract in section 8.
| Client | Kuwait Oil Company | Client reference | KOC-EXP-118 |
| Service line | Surface Well Testing | Operation type | HP/HT Exploration DST |
| Location | Onshore | Planned start | 2026-10-19 |
| Planned duration | 96 hours | Service classification | Sour (see section 7) |
| True vertical depth | 14,200 ft |
| Measured depth | 14,850 ft |
| Maximum inclination | 12.0 ° |
| Casing OD | 7.000 in |
| Tubing OD / ID | 3.500 / 2.992 in |
| Perforated interval | 13,960 – 14,080 ft |
| Packer depth | 13,800 ft |
| Reservoir pressure | 9,850 psia |
| Reservoir temperature | 312 °F |
| Productivity index | 0.42 stb/d/psi |
| Bubble point pressure | 5,200 psia |
| Oil gravity | 52.0 °API |
| Gas specific gravity | 0.810 |
| Water specific gravity | 1.060 |
| Gas-oil ratio | 12,500 scf/stb |
| Water cut | 4.0 % |
| Hydrogen sulphide | 12,400 ppm |
| Carbon dioxide | 8.60 mol % |
| Nitrogen | 2.20 mol % |
| Produced solids | 0.60 lb/1000 bbl |
| Target liquid rate | 1,200 bbl/d |
| Wellhead flowing pressure | 5,200 psia |
| Wellhead flowing temperature | 205 °F |
| Separator pressure | 900 psia |
| Separator inlet target temperature | 140 °F |
| Flowline length | 260 ft |
| Burner to manned area | 240 ft |
| Ambient temperature | 88 °F |
| Design wind speed | 9 mph |
| Position | Asset | Description | MAWP | Temp rating | Material class | Sour |
|---|---|---|---|---|---|---|
| Flowhead | FH-3015 | Surface Test Tree 3-1/16 in 15K | 15,000 psi | 350 °F | API 6A FF-HH-PSL3G-PR2 | Yes |
| Choke Manifold | CM-1503 | Dual Choke Manifold 3-1/16 in 15K | 15,000 psi | 350 °F | API 6A FF-HH-PSL3G | Yes |
| Flowline | FL-0300 | 3 in Sch 160 flowline, 10K rated | 10,000 psi | 250 °F | ASTM A106 Gr.B / NACE | Yes |
| Heater | HT-1000 | Indirect Bath Heater 10.0 MMBtu/hr | 15,000 psi | 350 °F | ASME Sec VIII Div 1 | Yes |
| Separator | SP-2160 | 3-Phase Horizontal Separator 2160 psi, 48 in x 15 ft | 2,160 psi | 300 °F | ASME Sec VIII Div 1 / NACE | Yes |
| Gas Flare | GF-0801 | Vertical Gas Flare Stack 8 in, 40 ft | — | — | — | No |
| Esd | ES-0001 | Wellhead ESD Panel, 3-station | — | — | — | Yes |
Each value below is produced by the platform's calculation engine from the data in section 3. The governing expression and the substituted values are printed with every result so that the calculation can be checked line by line without access to the software.
| Quantity | Value | Basis and calculation |
|---|---|---|
| Oil specific gravity (γ_o) | 0.7711 - |
γ_o = 141.5 / (131.5 + °API)
141.5 / (131.5 + 52.0) = 0.7711
API standard gravity definition |
| Oil rate at target (q_o) | 1,152 stb/d |
q_o = q_liq × (1 − WC)
1,200 × (1 − 0.040) = 1,152
Test objective |
| Water rate at target (q_w) | 48 bbl/d |
q_w = q_liq × WC
1,200 × 0.040 = 48
Test objective |
| Associated gas rate (q_g) | 14.400 MMscf/d |
q_g = q_o × GOR
1,152 × 12,500 = 14,400,000 scf/d
Test objective |
| Gas-liquid ratio (R) | 12,000 scf/bbl |
GLR = q_g / q_liq
14,400,000 / 1,200 = 12,000
Drives the choke correlation |
| Blended liquid specific gravity (γ_l) | 0.7827 - |
γ_l = (1 − WC)·γ_o + WC·γ_w
(1 − 0.040)·0.7711 + 0.040·1.0600 = 0.7827
Volume-weighted blend |
| Pseudo-critical temperature (sweet basis) (T_pc) | 403.7 °R |
T_pc = 169.2 + 349.5·γ_g − 74.0·γ_g²
169.2 + 349.5(0.8100) − 74.0(0.8100)² = 403.7
Sutton (1985) |
| Pseudo-critical pressure (sweet basis) (P_pc) | 648.3 psia |
P_pc = 756.8 − 131.0·γ_g − 3.6·γ_g²
756.8 − 131.0(0.8100) − 3.6(0.8100)² = 648.3
Sutton (1985) |
| Wichert-Aziz acid gas correction (ε) | 13.62 °R |
ε = 120(A^0.9 − A^1.6) + 15(B^0.5 − B⁴), A = y_H2S + y_CO2, B = y_H2S
A = 0.09840, B = 0.012400 → ε = 13.62 °R
Wichert & Aziz (1972) Without this correction the Z-factor for this sour stream would be wrong, and every downstream volume with it. |
| Gas compressibility at wellhead (Z) | 1.0140 - |
Z = A + (1−A)/e^B + C·P_pr^D (Brill & Beggs fit to Standing-Katz)
P_pr = 8.304, T_pr = 1.704 → Z = 1.0140
Brill & Beggs (1974) |
| Gas density at wellhead (ρ_g) | 16.872 lb/ft³ |
ρ_g = 2.70·γ_g·P / (Z·T)
2.70(0.8100)(5,200) / (1.0140 × 664.7) = 16.872
Real gas law |
| Oil formation volume factor (B_o) | 11.4138 rb/stb |
B_o = 0.9759 + 0.00012·[R_s·√(γ_g/γ_o) + 1.25·T]^1.2
R_s = 12,500, T = 205 °F → B_o = 11.4138
Standing (1947) |
| Total mass flow rate (ṁ) | 50,822 lb/hr |
ṁ = ṁ_gas + ṁ_oil + ṁ_water
37,112 + 12,968 + 743 = 50,822 lb/hr
Mass balance |
| Gas mass fraction (x_g) | 73.0 % |
x_g = ṁ_gas / ṁ_total
37,112 / 50,822 = 73.0 %
Used to weight the Joule-Thomson coefficient |
| Quantity | Value | Basis and calculation |
|---|---|---|
| Rate at bubble point (q_b) | 1,953 stb/d |
q_b = J × (P_r − P_b)
0.420 × (9,850 − 5,200) = 1,953
Straight-line IPR above bubble point |
| Absolute open flow potential (q_max) | 3,166 stb/d |
q_max = q_b + J·P_b / 1.8
1,953 + 0.420(5,200)/1.8 = 3,166
Vogel (1968) composite IPR |
| Flowing bottomhole pressure required (P_wf) | 7,107 psia |
q/q_max = 1 − 0.2(P_wf/P_r) − 0.8(P_wf/P_r)² solved for P_wf
q = 1,152 stb/d → P_wf = 7,107 psia
Vogel (1968) |
| Drawdown at target rate (ΔP) | 2,743 psi |
ΔP = P_r − P_wf
9,850 − 7,107 = 2,743
Reservoir management constraint |
| Fraction of open flow potential | 36.4 % |
q / q_max
1,152 / 3,166 = 36.4 %
Rate feasibility screen |
| Quantity | Value | Basis and calculation |
|---|---|---|
| Maximum anticipated surface pressure (MASP) | 7,684 psia |
MASP = P_r · exp(−0.01875·γ_g·TVD / (Z̄·T̄))
9,850 · exp(−0.01875(0.8100)(14,200)/(1.3166 × 659.7)) = 7,684
Compressible static gas column, gas-filled tubing worst case |
| Minimum equipment rating required | 8,453 psia |
MAWP_min = MASP × (1 + design margin)
7,684 × (1 + 10%) = 8,453
NESR ES-WT-002 design margin |
| Rated pressure of weakest upstream item | 10,000 psi |
min(MAWP) across flowhead, choke manifold and flowline
3 in Sch 160 flowline, 10K rated (FL-0300) = 10,000 psi
API 6A / ISO 10423 pressure class |
| Site pressure test value | 8,453 psi |
P_test = MASP × test factor
7,684 × 1.10 = 8,453
ASME B31.3 / client test procedure Hold 15 minutes with an acceptance criterion of no visible pressure decay. |
| Quantity | Value | Basis and calculation |
|---|---|---|
| Required choke bean size (d) | 23 64ths in |
d = (A · q_liq · R^B / P_wh)^(1/C)
(10.000 × 1,200 × 12,000^0.546 / 5,200)^(1/1.890) = 23.47 → 23/64 in
Gilbert (1954) multiphase critical flow correlation Rounded up to the nearest available bean in the manifold. |
| Equivalent bean diameter | 0.3594 in |
d_in = d / 64
23 / 64 = 0.3594 in
|
| Bean flow area (A) | 0.10143 in² |
A = π·d²/4
π(0.3594)²/4 = 0.10143 in²
|
| Pressure drop across the bean (ΔP) | 4,300 psi |
ΔP = P_wh − P_downstream
5,200 − 900 = 4,300
Drives Joule-Thomson cooling and erosion |
| Downstream / upstream pressure ratio | 0.173 - |
P_dn / P_up vs critical ratio
900 / 5,200 = 0.173 (critical at ≤ 0.55)
Isentropic choked flow Flow is critical. Rate is set by the bean and upstream pressure only, and is independent of separator pressure. This is the condition required for a stable, repeatable test. |
| Correlation | A | B | C | Bean (64ths) | Bean (in) |
|---|---|---|---|---|---|
| Gilbert (1954) | 10.000 | 0.546 | 1.890 | 23.5 | 0.3668 |
| Ros (1960) | 17.400 | 0.500 | 2.000 | 21.0 | 0.3277 |
| Baxendell (1957) | 9.560 | 0.546 | 1.930 | 21.5 | 0.3356 |
| Achong (1961) | 3.820 | 0.650 | 1.880 | 24.1 | 0.3759 |
| Quantity | Value | Basis and calculation |
|---|---|---|
| Mixture density at flowline conditions (ρ_m) | 4.976 lb/ft³ |
ρ_m = (12409·γ_l·P + 2.7·R·γ_g·P) / (198.7·P + R·T·Z)
P = 900 psia, T = 599.7 °R, R = 12,000 scf/bbl, Z = 0.8789 → 4.976 lb/ft³
API RP 14E section 2.5 |
| Applied erosional C-factor (C) | 125.0 - |
C = C_intermittent × (sand derate if applicable)
125, no derate (sand 0.60 pptb < 1.0 pptb trigger)
API RP 14E + NESR ES-WT-011 |
| Erosional velocity limit (V_e) | 56.04 ft/s |
V_e = C / √ρ_m
125.0 / √4.976 = 56.04 ft/s
API RP 14E |
| Actual volumetric flow at flowline conditions (q) | 3.6176 ft³/s |
q = q_gas·B_g/86400 + (q_o·B_o + q_w)·5.615/86400
gas 2.7600 + liquid 0.8576 = 3.6176 ft³/s
|
| Actual mixture velocity (V) | 96.33 ft/s |
V = q / A, A = π·d²/4
3.6176 / 0.03755 = 96.33 ft/s (2.624 in ID)
|
| Erosional velocity ratio (EVR) | 1.719 - |
EVR = V / V_e
96.33 / 56.04 = 1.719
Design target ≤ 0.80 |
| Minimum flowline ID to satisfy the limit (d_min) | 3.440 in |
d_min = √(4q / (π·V_e))
√(4×3.6176 / (π×56.04)) = 3.440 in
|
| Produced solids mass rate | 0.030 lb/hr |
ṁ_sand = q_liq × sand / 1000 / 24
1,200 × 0.60 / 1000 / 24 = 0.030 lb/hr
Sand management trigger |
| Quantity | Value | Basis and calculation |
|---|---|---|
| Effective Joule-Thomson coefficient (μ_JT) | 0.03421 °F/psi |
μ_JT = x_g·μ_gas + (1 − x_g)·μ_liquid
0.7302(0.0450) + 0.2698(0.0050) = 0.03421 °F/psi
Mass-weighted from the stream composition Weighting matters: a gas well cools an order of magnitude more across the same pressure drop than an oil well. |
| Temperature drop across the bean (ΔT) | 147.1 °F |
ΔT = μ_JT × ΔP
0.03421 × 4,300 = 147.1 °F
Joule-Thomson expansion |
| Temperature downstream of the bean (T_dn) | 57.9 °F |
T_dn = T_wh − ΔT
205 − 147.1 = 57.9 °F
|
| Hydrate formation temperature at separator pressure (T_h) | 66.5 °F |
T_h = −238.245 + 78.997·log P − 5.353·(log P)² + 349.474·γ_g − 150.855·γ_g² − 27.604·γ_g·log P
P = 900 psia, γ_g = 0.8100 → T_h = 66.5 °F
Motiee (1991) |
| Minimum process temperature | 140.0 °F |
T_req = max(T_h + margin, T_separator target)
max(66.5 + 10, 140) = 140.0 °F
Hydrate margin NESR ES-WT-004; separator target set by emulsion and viscosity control |
| Heating required | 82.1 °F |
ΔT_heat = T_req − T_dn
140.0 − 57.9 = 82.1 °F
|
| Process heat duty (Q) | 2.248 MMBtu/hr |
Q = Σ(ṁ_i · c_p,i) · ΔT
(37,112×0.55 + 12,968×0.48 + 743×1.00) × 82.1 = 2,247,778 Btu/hr
Sensible heat balance, GPSA specific heats |
| Fired duty required | 3.372 MMBtu/hr |
Q_fired = Q × design factor / thermal efficiency
2.248 × 1.20 / 0.80 = 3.372 MMBtu/hr
Vendor efficiency, NESR ES-WT-006 design factor |
| Quantity | Value | Basis and calculation |
|---|---|---|
| Gas density at separator (ρ_g) | 3.7341 lb/ft³ |
ρ_g = 2.70·γ_g·P / (Z·T)
P = 900 psia, T = 140 °F, Z = 0.8789 → 3.7341 lb/ft³
|
| Maximum gas velocity before carryover (V_max) | 1.390 ft/s |
V_max = K·√((ρ_l − ρ_g)/ρ_g)
0.40·√((48.84 − 3.7341)/3.7341) = 1.390 ft/s
Souders-Brown, API 12J, K for horizontal vessel with mist extractor |
| Gas disengagement area | 6.283 ft² |
A_gas = (1 − fill)·π·D²/4
(1 − 0.50)·π(4.00)²/4 = 6.283 ft²
Half-full horizontal vessel design case |
| Separator gas capacity | 45.57 MMscf/d |
q_max = V_max · A_gas · 86400 / B_g
1.390 × 6.283 × 86400 / 0.01656 = 45.57 MMscf/d
API 12J |
| Gas capacity utilisation | 31.6 % |
q_gas / q_max
14.400 / 45.57 = 31.6 %
|
| Liquid volume required for retention | 14.04 ft³ |
V = (q_o·t_o + q_w·t_w) × 5.615 / 1440
(1,152×3.0 + 48×3.0) × 5.615 / 1440 = 14.04 ft³
API 12J retention times |
| Liquid volume available | 94.25 ft³ |
V = fill · π·D²/4 · L
0.50 · π(4.00)²/4 · 15.0 = 94.25 ft³
|
| Separator liquid capacity | 8,057 bbl/d |
q_max = V_avail / 5.615 × 1440 / t_retention
94.25 / 5.615 × 1440 / 3.0 = 8,057 bbl/d
API 12J |
| Liquid capacity utilisation | 14.9 % |
V_required / V_available
14.04 / 94.25 = 14.9 %
|
| Quantity | Value | Basis and calculation |
|---|---|---|
| Total heat release at the burner (Q) | 630.0 MMBtu/hr |
Q = ṁ_oil·LHV_oil + q_gas·LHV_gas
0 lb/hr × 18,300 + 600,000 scf/hr × 1,050 = 630,000,000 Btu/hr
GPSA heating values |
| Flame length (L) | 96.4 ft |
L = 0.006 · Q^0.478
0.006 × (630,000,000)^0.478 = 96.4 ft
API STD 521 Annex C |
| Fraction of heat radiated (F) | 0.150 - |
Selected by combustion type
Gas burner → F = 0.150
API STD 521 Annex C |
| Safe distance, continuously manned area (D) | 123 ft |
D = √(τ·F·Q / (4π·K))
√(1.00 × 0.150 × 630,000,000 / (4π × 500)) = 123 ft
API STD 521 Table 8, 1.58 kW/m² |
| Radiation at the planned stand-off (K) | 131 Btu/hr·ft² |
K = τ·F·Q / (4π·D²)
τ·F·Q / (4π × 240²) = 131 Btu/hr·ft² (0.41 kW/m²)
API STD 521 |
| Exposure category | Limit | Equivalent | Minimum distance |
|---|---|---|---|
| Continuously manned area | 500 Btu/hr·ft² | 1.58 kW/m² | 123 ft |
| Escape route, seconds of exposure | 1,500 Btu/hr·ft² | 4.73 kW/m² | 71 ft |
| Equipment and unmanned areas | 2,000 Btu/hr·ft² | 6.31 kW/m² | 61 ft |
| Quantity | Value | Basis and calculation |
|---|---|---|
| H₂S partial pressure at MASP (p_H2S) | 95.2845 psia |
p_H2S = y_H2S × P
(12,400 / 10⁶) × 7,684 = 95.2845 psia
NACE MR0175 / ISO 15156-1 |
| Service classification | Sour service |
p_H2S ≥ 0.05 psia → sour service
NACE MR0175 / ISO 15156 All wetted pressure-containing components must carry NACE MR0175 certification, and personnel controls for H₂S apply for the full duration of the test. |
| Personal alarm set point | 10 ppm |
Fixed by HSE case
10 ppm
Client HSE case |
| Immediately dangerous to life or health | 100 ppm |
NIOSH IDLH
100 ppm
NIOSH |
Every check below is evaluated automatically against the standard named in the basis column. A critical failure prevents this document from being issued.
| Ref | Check | Result | Actual vs limit | Finding and basis |
|---|---|---|---|---|
| ERO-001 | Erosional velocity in the flowline critical |
FAIL | EVR 1.719 ≤ 0.80 |
Mixture velocity of 96.3 ft/s exceeds the API RP 14E erosional limit of 56.0 ft/s. Minimum acceptable flowline ID is 3.44 in against the 2.624 in selected. Action required: Select a flowline of at least 3.44 in ID, or reduce the target rate. API RP 14E
|
| HYD-001 | Hydrate formation margin downstream of the bean critical |
FAIL | -8.6 °F margin ≥ 10 °F |
Without heating the stream reaches 57.9 °F against a hydrate temperature of 66.5 °F. Hydrates will form in the choke body and flowline. Action required: Bring the heater on line before opening the well, or inject methanol / MEG at the choke inlet. Motiee (1991) hydrate correlation, NESR ES-WT-004 margin
|
| SOU-002 | H₂S exposure controls major |
CAUTION | 12,400 ppm in stream IDLH 100 ppm |
Stream H₂S concentration exceeds the IDLH threshold. Continuous gas detection, cascade breathing air, wind socks, muster points and a documented H₂S contingency plan are mandatory for the full test. Action required: Attach the H₂S contingency plan and the drill record to this DOS before issue. NIOSH / client HSE case
|
| CHK-001 | Critical flow across the bean major |
PASS | ratio 0.173 ≤ 0.55 |
The bean is in critical flow, so measured rates will be stable and independent of downstream conditions. Isentropic choked flow, k ≈ 1.27
|
| CHK-002 | Choke correlation sensitivity advisory |
PASS | 13.1 % spread below 40 % |
The four published correlations disagree by 13.1 % on bean size for this fluid. The correlations are in reasonable agreement for this fluid. Comparison of Gilbert, Ros, Baxendell and Achong
|
| DEL-001 | Target rate against inflow performance major |
PASS | 36.4 % of AOF below 90 % of AOF |
The target rate is comfortably inside the well's deliverability. Vogel (1968) IPR from the supplied productivity index
|
| FLU-001 | Z-factor correlation validity advisory |
PASS | T_pr 1.70 / P_pr 8.30 1.15 < T_pr < 2.4, P_pr < 15 |
Wellhead conditions are inside the published validity window of the correlation. Brill & Beggs (1974)
|
| HYD-002 | Heater duty adequacy major |
PASS | 3.372 MMBtu/hr required 10.00 MMBtu/hr rated |
Selected heater covers the fired duty at 34 % utilisation. The selected 10.0 MMBtu/hr unit is significantly oversized at 34 % utilisation; a smaller unit would reduce mobilisation cost. NESR ES-WT-006
|
| PRS-001 | Upstream pressure containment critical |
PASS | MASP 7,684 psia MAWP 10,000 psi |
Weakest upstream component is rated 10,000 psi against a MASP of 7,684 psia, a margin of 23.2 %. API 6A / NESR ES-WT-002
|
| PRS-002 | Separator relief protection critical |
PASS | Operating 900 psia MAWP 2,160 psi |
Separator rating is adequate for the planned operating pressure. A relief valve sized for the choke-washout case is still required. Action required: Confirm PSV set pressure at or below the vessel MAWP and size it for full choke bypass flow. API RP 14C / API 12J
|
| RAD-001 | Thermal radiation at manned areas critical |
PASS | 131 Btu/hr·ft² 500 Btu/hr·ft² |
Radiation at the planned stand-off is 26 % of the manned-area limit. API STD 521 Table 8 / IOGP 434-18
|
| SEP-001 | Separator gas handling capacity critical |
PASS | 31.6 % ≤ 85 % |
Vessel has adequate capacity for the design case. API SPEC 12J
|
| SEP-002 | Separator liquid retention capacity critical |
PASS | 14.9 % ≤ 85 % |
Vessel has adequate capacity for the design case. API SPEC 12J
|
| SOU-001 | Sour service material compliance critical |
PASS | 95.2845 psia H₂S ≥ 0.05 psia triggers sour service |
Sour service confirmed at 95.284 psia H₂S partial pressure. All rated components on the spread carry NACE MR0175 certification. NACE MR0175 / ISO 15156
|
| Parameter | Limit | Basis |
|---|---|---|
| Maximum anticipated surface pressure | 7,684 psia | Static gas column from reservoir pressure |
| Site pressure test value | 8,453 psi, 15 minute hold | ASME B31.3 / client test procedure |
| Choke bean, design case | 23/64 in | Governed choke correlation |
| Minimum separator inlet temperature | 66 °F + 10 °F margin | Hydrate control |
| Maximum flowline velocity | 56.0 ft/s | API RP 14E erosional limit |
| Separator operating pressure | 900 psia | Design case, PSV set at vessel MAWP |
| Minimum stand-off, manned areas | 123 ft | API STD 521, 500 Btu/hr·ft² |
| H₂S personal alarm | 10 ppm, evacuate at 15 ppm | Client HSE case |
| ESD closure, surface safety valve | 7 seconds maximum | API RP 14C |
The constants, correlation coefficients and design limits below were read from the company assumptions register at the time this document was generated. Each carries its revision number, so the calculation can be reproduced exactly at any future date.
| Category | Assumption | Value | Rev | Basis |
|---|---|---|---|---|
| Choke model | Achong coefficient A | 3.82 - | 1 | Achong (1961) |
| Choke model | Achong exponent B (GLR) | 0.65 - | 1 | Achong (1961) |
| Choke model | Achong exponent C (bean) | 1.88 - | 1 | Achong (1961) |
| Choke model | Baxendell coefficient A | 9.56 - | 1 | Baxendell (1957) |
| Choke model | Baxendell exponent B (GLR) | 0.546 - | 1 | Baxendell (1957) |
| Choke model | Baxendell exponent C (bean) | 1.93 - | 1 | Baxendell (1957) |
| Choke model | Critical (sonic) pressure ratio | 0.55 Pdn/Pup | 2 | Isentropic choked flow, k~1.27 |
| Choke model | Gilbert coefficient A | 10 - | 1 | Gilbert (1954), API 14B practice |
| Choke model | Gilbert exponent B (GLR) | 0.546 - | 1 | Gilbert (1954) |
| Choke model | Gilbert exponent C (bean) | 1.89 - | 1 | Gilbert (1954) |
| Choke model | Ros coefficient A | 17.4 - | 1 | Ros (1960) |
| Choke model | Ros exponent B (GLR) | 0.5 - | 1 | Ros (1960) |
| Choke model | Ros exponent C (bean) | 2 - | 1 | Ros (1960) |
| Deliverability | Vogel IPR coefficient on (Pwf/Pr) | 0.2 - | 1 | Vogel (1968) |
| Deliverability | Vogel IPR coefficient on (Pwf/Pr)^2 | 0.8 - | 1 | Vogel (1968) |
| Erosion | API 14E C-factor, intermittent service | 125 - | 1 | API RP 14E 2.5 |
| Erosion | C-factor derating when sand is present | 0.6 fraction | 3 | NESR internal ES-WT-011 |
| Erosion | Erosional velocity ratio caution threshold | 0.8 - | 1 | NESR internal ES-WT-011 |
| Erosion | Sand concentration triggering derate | 1 pptb | 2 | NESR internal ES-WT-011 |
| Heating | Heater duty design factor | 1.2 - | 2 | NESR internal ES-WT-006 |
| Heating | Indirect heater thermal efficiency | 0.8 fraction | 1 | Vendor data, glycol bath heaters |
| Heating | Specific heat of crude oil | 0.48 Btu/lb-degF | 1 | GPSA Data Book Sec. 23 |
| Heating | Specific heat of gas | 0.55 Btu/lb-degF | 1 | GPSA Data Book Fig. 24-7 |
| Heating | Specific heat of produced water | 1 Btu/lb-degF | 1 | Standard |
| Hydrates | Joule-Thomson cooling coefficient, gas phase | 0.045 degF/psi | 4 | Field-calibrated, MENA gas 0.6-0.75 SG |
| Hydrates | Minimum margin above hydrate formation temperature | 10 degF | 2 | NESR internal ES-WT-004 |
| Pressure integrity | Minimum margin of equipment MAWP over MASP | 10 % | 3 | NESR internal ES-WT-002 |
| Pressure integrity | Site pressure test factor on MOP | 1.1 - | 1 | ASME B31.3 / client procedure |
| Radiation | Atmospheric transmissivity | 1 - | 1 | API STD 521 6.4.2 |
| Radiation | Flame length correlation coefficient | 0.006 - | 1 | API STD 521 Annex C |
| Radiation | Flame length correlation exponent | 0.478 - | 1 | API STD 521 Annex C |
| Radiation | Fraction of heat radiated, gas flare | 0.15 - | 1 | API STD 521 Annex C |
| Radiation | Lower heating value of associated gas | 1,050 Btu/scf | 2 | GPSA Data Book Sec. 23 |
| Radiation | Lower heating value of crude | 18,300 Btu/lb | 1 | GPSA Data Book Sec. 23 |
| Radiation | Radiation limit, continuously manned area | 500 Btu/hr-ft2 | 1 | API STD 521 Table 8 (1.58 kW/m2) |
| Radiation | Radiation limit, equipment and unmanned areas | 2,000 Btu/hr-ft2 | 1 | API STD 521 Table 8 (6.31 kW/m2) |
| Radiation | Radiation limit, escape route, few seconds exposure | 1,500 Btu/hr-ft2 | 1 | API STD 521 Table 8 (4.73 kW/m2) |
| Separation | Design liquid fill fraction of separator volume | 0.5 fraction | 1 | API 12J |
| Separation | Oil retention time | 3 minutes | 2 | API 12J Table 1, 30-40 API crude |
| Separation | Separator utilisation caution threshold | 0.85 fraction | 1 | NESR internal ES-WT-008 |
| Separation | Souders-Brown K, horizontal vessel with mist extractor | 0.4 ft/s | 1 | API 12J / Arnold & Stewart |
| Separation | Water retention time | 3 minutes | 1 | API 12J Table 1 |
| Sour service | H2S immediately dangerous to life or health | 100 ppm | 1 | NIOSH |
| Sour service | H2S partial pressure threshold for sour service | 0.05 psia | 1 | NACE MR0175 / ISO 15156-1 |
| Sour service | H2S personal alarm set point | 10 ppm | 1 | OSHA / client HSE case |
| Reference | Title | Edition | Applied to |
|---|---|---|---|
| API RP 14C | Analysis, Design, Installation and Testing of Basic Surface Safety Systems | 8th Ed. | ESD architecture and relief protection |
| API RP 14E | Design and Installation of Offshore Production Platform Piping Systems | 5th Ed. | Erosional velocity limits, flowline sizing |
| API SPEC 12J | Specification for Oil and Gas Separators | 8th Ed. | Separator gas and liquid capacity |
| API SPEC 6A | Specification for Wellhead and Christmas Tree Equipment | 21st Ed. | Pressure ratings of flow control equipment |
| API STD 521 | Pressure-relieving and Depressuring Systems | 7th Ed. | Flare / burner thermal radiation and flame length |
| ASME B31.3 | Process Piping | 2022 | Flowline wall thickness and test pressure |
| IOGP 434-18 | Risk assessment data - thermal radiation exposure | 2019 | Personnel exposure thresholds |
| ISO 10423 | Wellhead and christmas tree equipment | 2009 | Equipment pressure/temperature class |
| NACE MR0175 | Materials for use in H2S-containing environments (ISO 15156) | 2015 | Sour service classification |